Sprint 40
Oct 14 - Oct 27, 2009
Goals
Accomplishments
Development
- FIPS 140-2 Compliance
- Release 2.1 - Patch 5 Completed
- Integration into Release 2.3 codebase in progress
- Certificate Revocation
- Research OCSP
- Access Consent Policy
- Completed design for storage of both XACML and Binary PDF form
- Completed update to store XACML in new format
- Created unit tests for formatting of new XACML
- Removed HIEM notification - per new specification
- Updated WSDL/Schemas for AdapterPIP with new fields to support the new specification
- Updated Doc Query to allow query parameter of EventCode (Policy OID)
- Patient Discovery Service Design
- Support DoD Limited Production
- POJO web service research.
- Refocus on automated testing - unit testing
CM/DM
- CDRLS Delivered
- CONNECT Test Plan
- CONNECT Test Report
- Installation Documents
- 2.1 Patch 5 Manual
- FIPS Instruction Manual
- 2.2 Installation documents per Jira and Internal comments
- 2.3 Installation documents per Jira and Internal comments
- CM Support Tasks
- Linux updates
- Vangent VM File Transfer
Security Team
- Documents Peer Reviewed:
- CRS System And Services Acquisition Policy and Procedure
- CRS Awareness and Training Policy and Procedure
- Documents Produced:
- CRS VM Architecture Diagram
- DoD Limited Release Project Support
- DIACAP Discussion Summit Meeting
- Phase 1a - Weekly Meeting
|
Summary
|
Release V2.3 (22%)
| Story Summary Details |
Planned/Assigned |
Completed |
| Stories |
33 |
18 |
| Story Points |
279 |
223 |
| Bugs Assigned |
Bugs Completed |
Bugs Remaining |
| 8 |
1 |
7 |
|
Velocity
| Sprint Velocity |
224 |
| Project Velocity |
245 |
|

Impediments
| ID |
Description |
Priority |
Owner |
| 20564 |
Late & Incomplete Code Drops are adding risk to the DoD Ltd Production Project |
Moderate (Risk) |
Marc Bernard |
| 20493 |
Lack of Equipment for the DoD Ltd production (Phase 1A) |
Moderate |
Marc Bernard |
| 19994 |
Need developer hardware: Ability to run two baseline concurrently on developer machine supporting DoD stewardship |
Moderate |
Janet Hofmeister |
| 19996 |
lack of hardware in dev env |
Moderate |
Janet Hofmeister |
| 17859 |
Solaris ESC preperation requires additional Sparc hardware in dev env |
Small |
Janet Hofmeister |
|
Sprint 41 Goals
-------------------------------------------------------------------------------------------------------
60-70%: SpecFactory Enhancements (TOP Priority)
5-10%: DoD Stewardship Resourcing
10-15%: Support (FedPartners, Wiki, Webinar, ..)
2-5%: Finalize FIPS in 2.3 Baseline
2-5%: 2.1 Patch #6
0-5%: CONNECT Architecture Research (LOWEST Priority, Time permitting)
-------------------------------------------------------------------------------------------------------
|
Surveys
Attachments
| |
Name |
Size |
Creator (Last Modifier) |
Creation Date |
Last Mod Date |
Comment |
|
 |
spr40.JPG |
85 kB |
Marc Bernard |
Oct 27, 2009 |
Oct 27, 2009 |
|
|
 |
Exported_User_Stories_Sprint_40.csv |
174 kB |
Brian Mowbray |
Oct 28, 2009 |
Oct 28, 2009 |
|
|
 |
NHIN_Sprint_40_Metrics.xlsx |
110 kB |
Brian Mowbray |
Oct 28, 2009 |
Oct 28, 2009 |
|
|
 |
TP - View Release (CONNECT Gateway)_1256738163746.png |
7 kB |
Brian Mowbray |
Oct 28, 2009 |
Oct 28, 2009 |
|
|
 |
TP - View Iteration (CONNECT Gateway)_1256738105598.png |
8 kB |
Brian Mowbray |
Oct 28, 2009 |
Oct 28, 2009 |
|
|
 |
TP - Features (CONNECT Gateway)_1256758678234.png |
75 kB |
Brian Mowbray |
Oct 28, 2009 |
Oct 28, 2009 |
|
|
 |
Survey results Sprint 40.xls |
24 kB |
Bridgett Smith |