Sprint 46 Progress Summary
JAN 06 - JAN 19
Goals
sql-query: dataSource: nhintpDS not found. select '
' + CAST(CustomField2 as VARCHAR(1024)) + '
' +
'edit' "Sprint Goals"
from
iteration, general
where
iteration.iterationid=generalid
and iteration.iterationid=20926
Accomplishments
Development
- Updated the Internal, Outbound, Validate and End-To-End Self-Tests with changes that Matt Wizeman presented at the Code-A-Thon: changes include loading the properties from the properties file at the project load script level, moving the GetDates step that is used by all the testcases to the load script and groovy updates to the SQL steps.
- Completed Service Registry Service Design Document and Sequence Diagrams
CM/DM
- Contract Deliverables
- A001 IDDP
- A002 PMP
- A004,5,6 Monthly Report
- A007 System Security Plan
- A014,30 CM Plan
- C&A Support
- Print and Prepared C&A Package for Delivery
- Documents Worked
- Various Install Doc Updates
- Updated docs for 2.4 and posted to interim site
- Updated CM Library with 2.3 Docs
Security Team and Operations Support
- CRS Certification and Accreditation Process
- Final ST&E results report delivered 13 Jan
- CONNECT Reference System ATO granted 15 Jan
- CAP Planning
- POAM Items entered into JIRA
- ST&E POAM items 70% complete
- CRS Lab Support
- Physical & Environmental Control Remediation
- Documentation updates
- CRS Physical Environmental & Media Protection Policy and Procedure
- CRS System Security Plan
Support
- NDMS support:
- Addressed Mural installation issues.
- SSA Support:
- Addressed MTOM issues.
- Upload document and patient data into DVA2.
- Sent Release 2.3 test gateway information.
- Addressed SAML assertion questions.
- Addressed issues in calling CONNECT services in pass-through mode.
- NHIN Team support:
- Sent sample SAML headers to NHIN team.
- Addressed questions related to SAML assertion
- Demostration support:
- AEGIS support:
- Addressed questions related to UDDI/profiles.
- Identified issues with Universal Client.
- Facilitated the VLER DT&E team's testing efforts during "Over-the-Shoulder" testing.
- Completed regression testing with the VA test team pointed to the VLER environment.
Tools and Infrastructure
- Upgraded portal to newer version of confluence (3.0.2)
- Moved portal, jira, crowd, and target process to commercial hosting facility
Build Times
- Created custom Ant task for WSIMPORT - based on JAX-WS original code
- Change was to remove generation of classes for included schemas
- Improved build time on that NhincCommonTypesLib by approximately 80% (On build server went from ~45 minutes to ~3 minutes)- Research of other build issues - identified places we can address in next sprint- Research of current build times on each project* Plan is to combine some projects together to reduce number of projects
- Short term plan to change from projects on classpath to jar files on classpath (this problem goes completely away with new build scripts)
Architecture 3.0 Dicussions
Metrics
| |
User Stories |
Effort |
| Assigned |
24 |
301 |
| Completed |
25 |
291 |
|
|

Stories
sql-query: dataSource: nhintpDS not found. select
'
' + CAST(userstoryid as VARCHAR)+'' AS "Id",
general.name "Name"
from
userstory,
general,
assignable,
entitystate
where
userstory.userstoryid=general.generalid
and userstory.userstoryid=assignable.assignableid
and assignable.entitystateid=entitystate.entitystateid
and assignable.projectid=1159
and userstory.iterationid=20926
order by
general.enddate DESC
more info
Testing Summary
Current Baseline (2.4.0.27)
Source Code
https://svn.connectopensource.org:8443/svn/Nhin_Public/tags/2.4.0.27/
Project Velocity
| Sprint 46 Velocity |
291 |
| Project Velocity |
230 |
|
|
Project Impediments
| Project Name |
Impediment ID |
Impediment |
Create Date |
Responsible |
State |
Priority |
Days Old |
| CONNECT Gateway |
26807 |
Deploy is failing on windows FIPS domain |
Jul 29 2010 |
Srikanth Vadlamani |
Open |
Critical |
3 |
| CONNECT Gateway |
23857 |
Need decision on Copyright Header Content |
Apr 14 2010 |
Marc Bernard |
Open |
Moderate |
109 |
| CONNECT Gateway |
17859 |
Solaris ESC preperation requires additional Sparc hardware in dev env |
Jul 9 2009 |
Janet Hofmeister |
Open |
Small |
388 |
|
Next Sprint Goals
Prioritized Goals for Sprint 47:
· Continue Addressing Build Times & Memory Issues (Highest Priority)
· MITA – Medicaid Eligibility Verification Stewardship
· XDR Push Service – Implementation
· UDDI & CertRev (Based on Resources Available - see impediments)
· Customer Support
· Stubbed DoD Adapter Plug-in Integration
· Universal Client Enhancements for 2.3
· Platform Neutral Build Scripts (Build Team)
· QA the Sprint and Update Installation Instructions (CESS)
· Wedge to Address Prioritized Bugs
· Process for Testing ESCs
· Setup OpenSSO in Staging Environment
|
Next Sprint User Stories (#47)
Here are the planned stories for Sprint #47 in priority order:
These stories have been updated based on the CONNECT team's Sprint 47 Planning session on 01/20/2010:
==============================================================================
- [21627]==3.0 Architecture Planning Meetings (Jan 20/21)
- [21477]==IMPLEMENTATION: Architectural / Memory Enhancements
- [22041]==IMPLEMENTATION: Memory Enhancements - Consolidated Gateway Projects
- [21609]==Fix Build Time Issues (Sprint 47)
- [21614]==[EPIC-47] Stewardship - [Code Drop 1] - CMS MITA Medicaid Eligibility Verification
- [21888]==Authorization Framework Updates for MITA - 2.3 Baseline
- [21909]==Design & Story Plans: XDR Push Service
- [21907]==IMPLEMENTATION: XDR Push Service: NHIN Service (Proxy) (Part 1 of 2)
- [20180]==[2.3 Update] NHIN Spec Gap: (UDDI) Service Registry service needs to support secure communications
- [20181]==[2.3 Update] NHIN Spec Gap: (UDDI) Service Registry service needs to support storing x.509 certs
- [21987]==IMPLEMENTATION: Memory Enhancements - Consolidated Adapter Projects
- [20182]==[2.3 Update] NHIN Spec Gap: (UDDI) Service Registry service needs to support queries by state
- [21561]==[2.3 Update] NHIN Spec GAP: UDDI Service Registry: Support tModel Changes
- [19681]==[EPIC] Create environment for new release (2.4)
- [21815]==Create testing environment for new release (2.4)
- [21585]==Stewardship - Stubbed DoD Adapter Contribution (Sprint 47)
- [21157]==Customer Support - Sprint 47
- [19967]==Tracking: HIMSS Support - Sprint 47
- [21616]==[EPIC-47] [BUILD TEAM] IDE Neutral Project Build Scripts (Split)
- [21703]==Update Sprint Summary Wiki Page to show Bug Burn-down Rate
- [21618]==[EPIC-47] ADDRESS BUG FIXES
- [20022]==Tracking: Support EAL3+ Crypto Module - FIPS compliance Migration
- [21891]==[CESS] [Admin] Combine windows and Linux installation instructions
- [21824]==Create process for testing ESC's
- [21936]==Create portal space environment for new release (2.4) (Split)
- [20458]==Admin Task Sprint 47
- [21943]==CM/DM
- [21937]==Contract Deliverables
- [20018]==Stewardship - Open Source Community Contributions (Sprint 47)
==============================================================================
|
Surveys
Attachments