Sprint 59 Progress Summary

June 23 - JuLY 6

Executive Summary

Overall Status: Good
The CCB and Architecture meetings occurred during this Sprint. These activities will help validate priorities for the release.
Overall Release Progress
Major Feature 3.1 Estimated
Progress
Risk Comments
CR: Secure & Unsecure Interfaces
between GW & Adapter
Yes 0% TBD - Approved by the CCB.
- To be merged with CONNECT CORE stories.
CR: Large File Support
for Document Retrieve
Yes 0% TBD - Approved by the CCB.
- MTOM/JAX-B/JDK-64 Research on-going
prior to implementation updates.
CR: Logging Enhancements Yes 0% TBD - Approved by the CCB.
- Research Design to begin this sprint.
CR: Administrative Distribution Documents
(e.g. PQRI feedback reports)
Yes 0% Low - Approved by the CCB.
- Implementation to begin in Sprint 60.
CONNECT CORE Refactoring Yes 10% Med -
Webinar (3.0) - 100% Low -
Deferred Document Retrieve Services Yes 20% Low - Design Document Complete.
LiFT Enhancements Yes <20% Med -
Patch 2.4.5 Yes 100% Low -
Patch 2.4.6 Yes 100% Low -
Merge Patch Updates to the Baseline Yes 0% Low -
Merge Patch Updates to 3.0 (Patch) Yes 50% Low - Latest Updates have been Merged.
- Patch not QA'd at this time
Patch 2.4.7 Yes 75% Low - MPI Enhancements for Conformance Testing
- Patient Discovery Broadcast does not finish.. (243)
- Thread-Locking update
- UDDI update to support two service names
UDDI Updates (Multiple standard-servicenames
for a single businessService)
Yes 100% Low -
Thread Locking Issue Yes 50% Low - Short-term fix part of 2.4.7.
- Other fixes (Retry) may be part of 2.4.8
- All fixes to be updated to 3.0 and the baseline
Automate Conformance Test Yes 75% Low -
Performance
Testing - Phase 2
Yes 0% TBD - Pending Working Group Meetings with Partners.
CONNECT Parameter Mapping Table Yes 0% Low - Document only for this release
Release QA Yes 0% Low -
ESC Validation, QA Yes 0% Low - Begins earlier in the release
Metrics
  Completed
User Stories
Remaining
Stories
Completed Effort
(Total Effort)
Remaining
Effort
Release
Completion %
Sprint 59 37 12 283.6 (333.3) 49.6
85%
Release 3.1 60 59 438 (2006) 1568 22%
Project Velocity 298
Issues & Impediments

http://tp.connectopensource.org/Project/Tracking/Impediment/List.aspx?ProjectID=1159

Impediments Severity
Need decision on Copyright Header Content Moderate

Goals

  • Customer Support
  • Parameter Mapping for CONNECT (Large Story)
  • Performance Testing/Research: Continue research on Thread Locking Issue.
  • Actual Webinar Event. (June 29th)
  • CCB Meetings
  • Patch 2.4.x – to include UDDI updates for NHIN.
  • Validate 2.4.x with NEW JDK 6u18 (thorough testing) – For SSA
  • CONNECT CORE Refactoring
  • Research – Support MTOM/JAXB for in-band File Transfer (up to 100MBs)
  • Large File support for Doc Retrieve
  • LiFT Enhancements
  • Continue updates to Automated Tests.
  • Research- Mural Adapter Updates (to support Suffix JIRA Issue)
  • Update Reference MPI implementation to support Suffix JIRA issue.
    • Migrated changes to 3.0 Branch
    • Migrated changes to 2.4 branch
  • TBD - Finalize Video Recording (for 3.0)
  • Upgrade GF to the latest release.
  • Merge 2.4.x Patch updates to Release 3.0 – TBD (Can potentially wait another Sprint)
  • Merge 2.4.x Patch updates to BASELINE – TBD (Can potentially wait another Sprint)

Accomplishments

Development

  • Merged 2.4.3 , 2.4.4 , and 2.4.5 into 3.0.1 patch
  • Merged 2.4.6 into 3.1 and 3.0.1 patch
  • Created Automated tests and Manual tests to validate the merges from 2.3, 2.4, 2.5 and 2.6. to 3.1 baseline and 3.0.1 patch which covered JIRA issues 191, 201, 204, 205, 207, 209, 219, 220, 227, 229 and 231
  • Completed 2.4.7 and 3.0.1 patches to address multiple service names in the UDDI registry
  • Merged the UDDI patch to handle multiple service names into the 3.1 baseline
  • Manually validated the UUDI patch for 2.4.7 patch, 3.0.1 patch and current 3.1
  • Completed CORE Refactor design and implementation plan: Core Java Library Architecture wiki page
  • Upgraded JDK version to JDK6u18 for OCSP testing and ran all Smoke Tests.
  • Completed initial research on large inband file transfers with respect to MTOM, JAXB, and 64-bit JDK
  • Thread lock issue fixed and ran all validation tests in CONNECT 2.4
  • Document retrieve deferred design document completed internal review in progress.
  • Removed the run time dependency on the NHINC_PROPERTIES_DIR environment variable. This fixes JIRA bugs Gateway-67, Gateway-113, Gateway-149 and Gateway-161 and allows users to load balance CONNECT transactions across multiple instances of CONNECT running on the same machine.
  • Created soapUI projects for the Doc Query, Doc Retrieve and Patient Discovery conformance test cases
  • Research- Mural Adapter Updates (to support Suffix JIRA Issue)
  • Updated Reference MPI implementation to support Suffix JIRA issue.
    • Migrated changes to 3.0 Branch
    • Migrated changes to 2.4 branch

CI Support

  • Setup 3.1 FIPS/Non-FIPS staging servers
  • Setup 2.4.6 Release build to 2.4 staging servers
  • Upgrade SOAPUI-Pro to 3.5.1 on Devloper and build servers
  • SOAP UI on Solaris and Linux build servers upgraded to SOAPUI Basic version 3.5.1
  • CI build process changed to run as windows service, no manual restart required when system is bounced
  • Create new Conformance Test server
  • Build support activities related to software upgrade
  • Validation Test was failing on Solaris/Linux, added step to bounce Glassfish after deploy is done

Support

  • NHIN Team:
    - Assisted KP with Cert Issue
    - KP Conformance Testing
    - Investigated soap 1.1 error from KP Request message
  • SSA:
    - Coordinated SSA site visit on 6/29
    - PROVIDED ONSITE SUPPORT AND TROUBLESHOOTING- Admin Console
  • VA:
    - Supported VA Invalid Patient Id Doc Query Conformance Investigation
    - Determined status of Interop Lab to support VA Interop testing
    - Submitted VA Conformance Logs for NIST analysis
    - Investigated for VA:
    • Conformance QDR 5.9 Responder Failures
    • Class code PD Conformance Test Failure
    • Conformance SAML Issue
    • Broadcast PD
    • PurposeForUse vs. PurposeOfUse Conformance Issue
    • PD Interaction on 201305 message
  • DOD:
    - Investigated DoD Certificate Issue
    - VLER Phase 1b Hotwash JMIS IA testing and JMIS DT&E
    - Followed up on loopback issue
    - Investigated DoD Document Query Error (UDDI log messages)
  • ESC Upgrade support Conformance Retest:
    - Configured and Uploaded data for Testgateway ESC upgrade
  • Additional Tasks:
    - Created soapUI project for Interoperability Testing
    - Annotated Conformance Testing spreadsheets as Gateway vs. Adapter AND PROVIDED TO Dave
    - Created Conformance testing files for uploading patients
    - Performed Error Handling for Patient ID Spec Question
    - Reviewed Patch release slides
    - Updated Backwards Compatibility page

CM/DM

  • Contract Deliverables:
    - Began compiling TP data for Monthly Report due 7/8/10
    - Reviewed and forwarded IDPP to Contracts for Delivery to Customer
    - Updated CM Library with June deliverables and latest versions of instruction docs
  • Converted following docs to wiki format:
    - FIPS Compliance (Windows/Glassfish)
    - Integrated Interface Description
  • Reviewed and discussed updates to:
    - Support Plan
    - Guidance Document
    - Program CCB Process Directive
  • Inventory
    - Updated Inventory to reflect return of server to Evolvent
  • Revamp of Windows Source, Windows Binary and Linux Source documentations in the 3.1 space. Affected areas included
    - Removed: Manual setting of Memory Options
    - Added to all pages: Certificates Section, recreate.glassfish.domain, hardcoded wsdl fix, updated deployment table
  • Supported CONNECT Support Team Activities

Tools and Infrastructure

  • Performed maintenance on the ESX hosts
  • Performed maintenance on the ESX guests
  • Updated inventory spreadsheet to reflect equipment updates

Metrics







Build Summary

Build Time (min)
Sprint 59 3.1.0.38 11:28
Sprint 58 3.1.0.14 08:37
Sprint 57 3.1.0.1 06:42
Sprint 56 3.0.0.332 07:38
Sprint 55 3.0.0.279 11:31
Sprint 54 3.0.0.231 10:26
Sprint 53 3.0.0.184 08:13
Sprint 52 3.0.0.128 14:54
Sprint 51 3.0.0.61 12:34
Sprint 49 2.4.0.262 07:45
Sprint 48 2.4.0.191 07:13
Sprint 47 2.4.0.103 14:17
Sprint 46 2.4.0.27 24:12
Sprint 45 2.4.0.3 27:26

Testing Summary

Current Baseline

Test Type Tests Failures Errors Success rate Time (sec)
Automated Unit Tests 1116 0 0 100% 68.463
Automated Integration Tests (JUnit) 181 0 0 100% 20.018
Automated Validation Tests (SOAPUI) 24 0 0 100% 978.625
Automated Regression Tests (SOAPUI) 318 0 0 100% 2497.689


Unable to render embedded object: File (AutomatedTests.JPG) not found.


Source Code

https://svn.connectopensource.org:8443/svn/NHIN_Public/tags/3.1.0.34/


Sprint MVP








Next Sprint Goals

• Monthly Architecture Meetings
• Customer support
• Research – Large File support – Finalize before moving to Implementation
• ThreadLocking Issue – finalize.
• Research/Design – Audit Logging CR
• CONNECT CORE Refactoring
• Research story to understand secure/unsecure services
• Automate Conformance Tests
• Performance Testing Analysis
• T63 / PQRI – Implementation
• Design – Deferred Doc Query
• LiFT Enhancements, LiFT on FIPS
• Feasibility Analysis of Replicating Customer Environments
• CollabNet Trial
• Tools and Infrastructure
• Build Team Activities
• TBD – Parameter Mapping Tables… (need to determine if we have bandwidth this sprint).

Next Sprint User Stories (#60)

Survey

It's important that you take a moment to complete the following survey:

http://www.surveymonkey.com/s/9SNC7H2

Attachments

  Name Size Creator (Last Modifier) Creation Date Last Mod Date Comment  
File CONNECT Release 3.1 Progress 070710.JPG 197 kB Bridgett Smith Jul 07, 2010 Jul 07, 2010  
File CONNECT Sprint 59 Progress 070710.JPG 223 kB Bridgett Smith Jul 07, 2010 Jul 07, 2010  
File Sprint 59 User_Story.csv 242 kB Bridgett Smith Jul 07, 2010 Jul 07, 2010  
File Sprint59bugs.jpg 77 kB Bridgett Smith Jul 07, 2010 Jul 07, 2010  
File Sprint59progress.jpg 60 kB Bridgett Smith Jul 07, 2010 Jul 07, 2010  
File Sprint_59_Metrics.xlsx 70 kB Bridgett Smith Jul 07, 2010 Jul 07, 2010  
File Aleena 59.JPG 91 kB Janet Hofmeister Jul 07, 2010 Jul 07, 2010  
File Sprint 59 Executive Summary.pptx 399 kB Bridgett Smith Jul 07, 2010 Jul 07, 2010  
Microsoft Word A011_059_Meeting Minutes_070710_NHIN-C_Sprint_59_Review.doc 465 kB Bridgett Smith Jul 07, 2010 Jul 07, 2010   View
PDF File A011_059_Meeting Minutes_070710_NHIN-C_Sprint_59_Review.pdf 401 kB Bridgett Smith Jul 07, 2010 Jul 07, 2010   View
File Sprint59.JPG 19 kB Marc Bernard Jul 08, 2010 Jul 08, 2010  
Microsoft Excel Survey results Sprint 59.xls 22 kB Bridgett Smith Aug 03, 2010 Aug 03, 2010   View
Adaptavist Theme Builder (3.3.3-conf210) Powered by Atlassian Confluence 3.0.2, the Enterprise Wiki.
Free theme builder license