Sprint 59 Progress Summary

June 23 - JuLY 6
Executive Summary
Overall Status: Good
 | The CCB and Architecture meetings occurred during this Sprint. These activities will help validate priorities for the release. |
Overall Release Progress
| Major Feature |
3.1 |
Estimated
Progress |
Risk |
Comments |
CR: Secure & Unsecure Interfaces
between GW & Adapter |
Yes |
0% |
TBD |
- Approved by the CCB.
- To be merged with CONNECT CORE stories. |
CR: Large File Support
for Document Retrieve |
Yes |
0% |
TBD |
- Approved by the CCB.
- MTOM/JAX-B/JDK-64 Research on-going
prior to implementation updates. |
| CR: Logging Enhancements |
Yes |
0% |
TBD |
- Approved by the CCB.
- Research Design to begin this sprint. |
CR: Administrative Distribution Documents
(e.g. PQRI feedback reports) |
Yes |
0% |
Low |
- Approved by the CCB.
- Implementation to begin in Sprint 60. |
| CONNECT CORE Refactoring |
Yes |
10% |
Med |
- |
| Webinar (3.0) |
- |
100% |
Low |
- |
| Deferred Document Retrieve Services |
Yes |
20% |
Low |
- Design Document Complete. |
| LiFT Enhancements |
Yes |
<20% |
Med |
- |
| Patch 2.4.5 |
Yes |
100% |
Low |
- |
| Patch 2.4.6 |
Yes |
100% |
Low |
- |
| Merge Patch Updates to the Baseline |
Yes |
0% |
Low |
- |
| Merge Patch Updates to 3.0 (Patch) |
Yes |
50% |
Low |
- Latest Updates have been Merged.
- Patch not QA'd at this time |
| Patch 2.4.7 |
Yes |
75% |
Low |
- MPI Enhancements for Conformance Testing
- Patient Discovery Broadcast does not finish.. (243)
- Thread-Locking update
- UDDI update to support two service names |
UDDI Updates (Multiple standard-servicenames
for a single businessService) |
Yes |
100% |
Low |
- |
| Thread Locking Issue |
Yes |
50% |
Low |
- Short-term fix part of 2.4.7.
- Other fixes (Retry) may be part of 2.4.8
- All fixes to be updated to 3.0 and the baseline |
| Automate Conformance Test |
Yes |
75% |
Low |
- |
Performance
Testing - Phase 2 |
Yes |
0% |
TBD |
- Pending Working Group Meetings with Partners. |
| CONNECT Parameter Mapping Table |
Yes |
0% |
Low |
- Document only for this release |
| Release QA |
Yes |
0% |
Low |
- |
| ESC Validation, QA |
Yes |
0% |
Low |
- Begins earlier in the release |
Metrics
| |
Completed
User Stories |
Remaining
Stories |
Completed Effort
(Total Effort) |
Remaining
Effort |
Release
Completion % |
| Sprint 59 |
37 |
12 |
283.6 (333.3) |
49.6 |
85% |
| Release 3.1 |
60 |
59 |
438 (2006) |
1568 |
22% |
| |
Issues & Impediments
http://tp.connectopensource.org/Project/Tracking/Impediment/List.aspx?ProjectID=1159
| Impediments |
Severity |
| Need decision on Copyright Header Content |
Moderate |
Goals
- Customer Support
- Parameter Mapping for CONNECT (Large Story)
- Performance Testing/Research: Continue research on Thread Locking Issue.
- Actual Webinar Event. (June 29th)
- CCB Meetings
- Patch 2.4.x – to include UDDI updates for NHIN.
- Validate 2.4.x with NEW JDK 6u18 (thorough testing) – For SSA
- CONNECT CORE Refactoring
- Research – Support MTOM/JAXB for in-band File Transfer (up to 100MBs)
- Large File support for Doc Retrieve
- LiFT Enhancements
- Continue updates to Automated Tests.
- Research- Mural Adapter Updates (to support Suffix JIRA Issue)
- Update Reference MPI implementation to support Suffix JIRA issue.
- Migrated changes to 3.0 Branch
- Migrated changes to 2.4 branch
- TBD - Finalize Video Recording (for 3.0)
- Upgrade GF to the latest release.
- Merge 2.4.x Patch updates to Release 3.0 – TBD (Can potentially wait another Sprint)
- Merge 2.4.x Patch updates to BASELINE – TBD (Can potentially wait another Sprint)
|
Accomplishments
Development
- Merged 2.4.3 , 2.4.4 , and 2.4.5 into 3.0.1 patch
- Merged 2.4.6 into 3.1 and 3.0.1 patch
- Created Automated tests and Manual tests to validate the merges from 2.3, 2.4, 2.5 and 2.6. to 3.1 baseline and 3.0.1 patch which covered JIRA issues 191, 201, 204, 205, 207, 209, 219, 220, 227, 229 and 231
- Completed 2.4.7 and 3.0.1 patches to address multiple service names in the UDDI registry
- Merged the UDDI patch to handle multiple service names into the 3.1 baseline
- Manually validated the UUDI patch for 2.4.7 patch, 3.0.1 patch and current 3.1
- Completed CORE Refactor design and implementation plan: Core Java Library Architecture wiki page
- Upgraded JDK version to JDK6u18 for OCSP testing and ran all Smoke Tests.
- Completed initial research on large inband file transfers with respect to MTOM, JAXB, and 64-bit JDK
- Thread lock issue fixed and ran all validation tests in CONNECT 2.4
- Document retrieve deferred design document completed internal review in progress.
- Removed the run time dependency on the NHINC_PROPERTIES_DIR environment variable. This fixes JIRA bugs Gateway-67, Gateway-113, Gateway-149 and Gateway-161 and allows users to load balance CONNECT transactions across multiple instances of CONNECT running on the same machine.
- Created soapUI projects for the Doc Query, Doc Retrieve and Patient Discovery conformance test cases
- Research- Mural Adapter Updates (to support Suffix JIRA Issue)
- Updated Reference MPI implementation to support Suffix JIRA issue.
- Migrated changes to 3.0 Branch
- Migrated changes to 2.4 branch
CI Support
- Setup 3.1 FIPS/Non-FIPS staging servers
- Setup 2.4.6 Release build to 2.4 staging servers
- Upgrade SOAPUI-Pro to 3.5.1 on Devloper and build servers
- SOAP UI on Solaris and Linux build servers upgraded to SOAPUI Basic version 3.5.1
- CI build process changed to run as windows service, no manual restart required when system is bounced
- Create new Conformance Test server
- Build support activities related to software upgrade
- Validation Test was failing on Solaris/Linux, added step to bounce Glassfish after deploy is done
Support
- NHIN Team:
- Assisted KP with Cert Issue
- KP Conformance Testing
- Investigated soap 1.1 error from KP Request message
- SSA:
- Coordinated SSA site visit on 6/29
- PROVIDED ONSITE SUPPORT AND TROUBLESHOOTING- Admin Console
- VA:
- Supported VA Invalid Patient Id Doc Query Conformance Investigation
- Determined status of Interop Lab to support VA Interop testing
- Submitted VA Conformance Logs for NIST analysis
- Investigated for VA:
- Conformance QDR 5.9 Responder Failures
- Class code PD Conformance Test Failure
- Conformance SAML Issue
- Broadcast PD
- PurposeForUse vs. PurposeOfUse Conformance Issue
- PD Interaction on 201305 message
- DOD:
- Investigated DoD Certificate Issue
- VLER Phase 1b Hotwash JMIS IA testing and JMIS DT&E
- Followed up on loopback issue
- Investigated DoD Document Query Error (UDDI log messages)
- ESC Upgrade support Conformance Retest:
- Configured and Uploaded data for Testgateway ESC upgrade
- Additional Tasks:
- Created soapUI project for Interoperability Testing
- Annotated Conformance Testing spreadsheets as Gateway vs. Adapter AND PROVIDED TO Dave
- Created Conformance testing files for uploading patients
- Performed Error Handling for Patient ID Spec Question
- Reviewed Patch release slides
- Updated Backwards Compatibility page
CM/DM
- Contract Deliverables:
- Began compiling TP data for Monthly Report due 7/8/10
- Reviewed and forwarded IDPP to Contracts for Delivery to Customer
- Updated CM Library with June deliverables and latest versions of instruction docs
- Converted following docs to wiki format:
- FIPS Compliance (Windows/Glassfish)
- Integrated Interface Description
- Reviewed and discussed updates to:
- Support Plan
- Guidance Document
- Program CCB Process Directive
- Inventory
- Updated Inventory to reflect return of server to Evolvent
- Revamp of Windows Source, Windows Binary and Linux Source documentations in the 3.1 space. Affected areas included
- Removed: Manual setting of Memory Options
- Added to all pages: Certificates Section, recreate.glassfish.domain, hardcoded wsdl fix, updated deployment table
- Supported CONNECT Support Team Activities
Tools and Infrastructure
- Performed maintenance on the ESX hosts
- Performed maintenance on the ESX guests
- Updated inventory spreadsheet to reflect equipment updates
|
Metrics


Build Summary
| Build |
Time (min) |
| Sprint 59 3.1.0.38 |
11:28 |
| Sprint 58 3.1.0.14 |
08:37 |
| Sprint 57 3.1.0.1 |
06:42 |
| Sprint 56 3.0.0.332 |
07:38 |
| Sprint 55 3.0.0.279 |
11:31 |
| Sprint 54 3.0.0.231 |
10:26 |
| Sprint 53 3.0.0.184 |
08:13 |
| Sprint 52 3.0.0.128 |
14:54 |
| Sprint 51 3.0.0.61 |
12:34 |
| Sprint 49 2.4.0.262 |
07:45 |
| Sprint 48 2.4.0.191 |
07:13 |
| Sprint 47 2.4.0.103 |
14:17 |
| Sprint 46 2.4.0.27 |
24:12 |
| Sprint 45 2.4.0.3 |
27:26 |
Testing Summary
Current Baseline
Unable to render embedded object: File (AutomatedTests.JPG) not found.
Source Code
https://svn.connectopensource.org:8443/svn/NHIN_Public/tags/3.1.0.34/
Sprint MVP

Next Sprint Goals
• Monthly Architecture Meetings
• Customer support
• Research – Large File support – Finalize before moving to Implementation
• ThreadLocking Issue – finalize.
• Research/Design – Audit Logging CR
• CONNECT CORE Refactoring
• Research story to understand secure/unsecure services
• Automate Conformance Tests
• Performance Testing Analysis
• T63 / PQRI – Implementation
• Design – Deferred Doc Query
• LiFT Enhancements, LiFT on FIPS
• Feasibility Analysis of Replicating Customer Environments
• CollabNet Trial
• Tools and Infrastructure
• Build Team Activities
• TBD – Parameter Mapping Tables… (need to determine if we have bandwidth this sprint).
|
Next Sprint User Stories (#60)
Survey
It's important that you take a moment to complete the following survey:
http://www.surveymonkey.com/s/9SNC7H2
|
Attachments
| |
Name |
Size |
Creator (Last Modifier) |
Creation Date |
Last Mod Date |
Comment |
|
 |
CONNECT Release 3.1 Progress 070710.JPG |
197 kB |
Bridgett Smith |
Jul 07, 2010 |
Jul 07, 2010 |
|
|
 |
CONNECT Sprint 59 Progress 070710.JPG |
223 kB |
Bridgett Smith |
Jul 07, 2010 |
Jul 07, 2010 |
|
|
 |
Sprint 59 User_Story.csv |
242 kB |
Bridgett Smith |
Jul 07, 2010 |
Jul 07, 2010 |
|
|
 |
Sprint59bugs.jpg |
77 kB |
Bridgett Smith |
Jul 07, 2010 |
Jul 07, 2010 |
|
|
 |
Sprint59progress.jpg |
60 kB |
Bridgett Smith |
Jul 07, 2010 |
Jul 07, 2010 |
|
|
 |
Sprint_59_Metrics.xlsx |
70 kB |
Bridgett Smith |
Jul 07, 2010 |
Jul 07, 2010 |
|
|
 |
Aleena 59.JPG |
91 kB |
Janet Hofmeister |
Jul 07, 2010 |
Jul 07, 2010 |
|
|
 |
Sprint 59 Executive Summary.pptx |
399 kB |
Bridgett Smith |
Jul 07, 2010 |
Jul 07, 2010 |
|
|
 |
A011_059_Meeting Minutes_070710_NHIN-C_Sprint_59_Review.doc |
465 kB |
Bridgett Smith |
Jul 07, 2010 |
Jul 07, 2010 |
|
View
|
 |
A011_059_Meeting Minutes_070710_NHIN-C_Sprint_59_Review.pdf |
401 kB |
Bridgett Smith |
Jul 07, 2010 |
Jul 07, 2010 |
|
View
|
 |
Sprint59.JPG |
19 kB |
Marc Bernard |
Jul 08, 2010 |
Jul 08, 2010 |
|
|
 |
Survey results Sprint 59.xls |
22 kB |
Bridgett Smith |
Aug 03, 2010 |
Aug 03, 2010 |
|
View
|
|
|
|